EGNATIA HIGHWAY: KOULOURA - KLIDI (6.0)

The project consists of the construction of a second branch and a separation isle with a total length of 25,14km in the existing constructed branch of 13,5m width from Klidi to Kouloura. The new highway will have a total width of 24,5m and will consist of two traffic lanes and one emergency lane in each direction with a central isle of 4,5m width. The project also includes the construction of several bridges, parallel and vertical highways as well as other technical works.

LocationGREECE, CENTRAL MACEDONIA
ClientEGNATIA ODOS SA
ContractorEKTER SA
Participation100%
Construction Period01/2000-01/2002
Project value43,175,000.00€
ObjectConstruction of a second branch and a separation isle with a total length of 25,14km in the existing constructed branch of 13,5m width from Klidi to Kouloura.

Technical Data:

Total length: 25,14 km

Earthfill volume: 700.000 m3

Road pavement: 2.032.500 m2

Asphalt pavement: 5.825.000 m2

Four(4) bridges along the length of the highway:46m, 59m, 55m, & 138m long spans respectively

Under-passages : four (4) 6m span each

Small technical works: 29 drains of several dimensions