ELVAL SA PLANT
The project consists of the construction of a new Cold SMS Roller at the Elval Plant.

LocationGREECE, INOFITA VIOTIAS
ClientELVAL SA
ContractorEKTER SA
Participation100%
Construction Period12/1999 - 12/2000
Project value3,188,000.00
ObjectNEW COLD SMS ROLLER
Technical Data:

Reinforced concrete volume: 17.768 m3

Exposed concrete formwork: 8.073 m2

Construction of industrial floors covering: 1.394 m2

Drilling of Φ1000 boreholes: 1.200 m piles

Construction of exposed coating: 4.990 m2

Glazing construction of total area: 155 m2

Construction of suspended ceiling area: 463 m2

Construction of plaster partition area: 599 m2

Installation of ceramic tiles: 584 m2

Installation of building's electrical system

Installation of building's hydraulic system

Installation of building's fire detection system

Construction of a structured building cabling system