GENERAL HOSPITAL OF LARISSA
The project includes the addition of 3 buildings and of one connecting wing in the existing complex of the General Hospital of Larissa. The total additional surface area is 1.400 m2 which includes laboratories, surgery rooms, an intensive care and sterilisation units.
In order to support the foundations of the adjacent buildings, excavation below the existing foundations was required whereby a diaphragm wall of 2.500m2 was constructed.

LocationGREECE, LARISA
ClientLARISSA HOSPITAL
ContractorEKTER SA
Participation100%
Construction Period12/1990 - 12/1996
Project value5,756,000.00
ObjectAddition of 3 buildings with a total area of 1,400 sq. m. and 1 connecting wing to the existing complex of Larissa General Hospital.
Technical Data:

Laboratory, surgery surface area: 1.400 m2

Overall volume of building installations: 8.250 m2

Number of surgery rooms: 8

Number of rooms in the hospital: 350