PATRAS GENERAL HOSPITAL

"AGIOS ANDREAS"

The project involves the upgrading of multi-storey section of the main building of the General Hospital of Patras "Agios Andreas" which consists of: Designated foundation to be used for E/ M installations.

LocationGREECE, PATRA
ClientKTYP SA
ContractorEKTER SA
Participation100%
Construction Period12/2013 - 12/2016
Project value14,944,000.00 €
ObjectUpgrading of the central building of Patras General Hospital and supply and installation of medical, hotel and other equipment.

Technical Data:

Total area of ​​building facilities: 9,352m2

Number of surgeries: 2

  • 1st floor: Caesarean Section
  • Ground Floor: Septic Surgery

Hospital Beds: 166

  • 7th floor: Ophthalmology - ENT 29 beds
  • 6th floor: Urological - Plastic Surgery 29 beds
  • 5th floor: Cardiology 21 beds
  • 4th floor: Pathological A & Prisoners 29 beds
  • 3rd floor: Pathology B 31 beds
  • 2nd floor: Obstetrics - Gynecology 27 beds

Special Unit Beds: 14

  • 5th floor: Heart Attack Unit 5 beds
  • 1st floor: Infant and Premature Department 9 beds

Electrical Installations:

  • Medium Voltage Substation with 3 1000 KVA Transformers
  • 2 Air Cooled Chillers 125RT (440kW) & 2 Heat Pumps 105 RT (372kW)
  • 9 Central Air Conditioning Units and 7 Fan Section Fans
  • Hydration, firefighting, medical gases, strong and weak currents equipment

Special Facilities

  • Cooking
  • Washing machines
  • Spiritual Mail

Medical Equipment

  • Coronary angiography, Mammography, X-ray machines
  • Urological Laser, Ballistic Lithotripter
  • Anesthesia units, Ventilators, Incubators, etc.
  • Endoscopy equipment
  • Physiotherapy equipment
  • Hospital and intensive care beds