PATRAS GENERAL HOSPITAL
"AGIOS ANDREAS"
The project involves the upgrading of multi-storey section of the main building of the General Hospital of Patras "Agios Andreas" which consists of: Designated foundation to be used for E/ M installations.

LocationGREECE, PATRA
ClientKTYP SA
ContractorEKTER SA
Participation100%
Construction Period12/2013 - 12/2016
Project value14,944,000.00 €
ObjectUpgrading of the central building of Patras General Hospital and supply and installation of medical, hotel and other equipment.
Technical Data:

Total area of building facilities: 9,352m2

Number of surgeries: 2
- 1st floor: Caesarean Section
- Ground Floor: Septic Surgery

Hospital Beds: 166
- 7th floor: Ophthalmology - ENT 29 beds
- 6th floor: Urological - Plastic Surgery 29 beds
- 5th floor: Cardiology 21 beds
- 4th floor: Pathological A & Prisoners 29 beds
- 3rd floor: Pathology B 31 beds
- 2nd floor: Obstetrics - Gynecology 27 beds

Special Unit Beds: 14
- 5th floor: Heart Attack Unit 5 beds
- 1st floor: Infant and Premature Department 9 beds

Electrical Installations:
- Medium Voltage Substation with 3 1000 KVA Transformers
- 2 Air Cooled Chillers 125RT (440kW) & 2 Heat Pumps 105 RT (372kW)
- 9 Central Air Conditioning Units and 7 Fan Section Fans
- Hydration, firefighting, medical gases, strong and weak currents equipment

Special Facilities
- Cooking
- Washing machines
- Spiritual Mail

Medical Equipment
- Coronary angiography, Mammography, X-ray machines
- Urological Laser, Ballistic Lithotripter
- Anesthesia units, Ventilators, Incubators, etc.
- Endoscopy equipment
- Physiotherapy equipment
- Hospital and intensive care beds