PUPLIC POWER CORPORATION (DEI) NETWORKS FILOTHEI – KIFISSIA
The project concerns the construction, removal, reconstruction, alteration and improvement of Low/Medimu/High Voltage Electric Networks in the area of Filothei-Kifissia.
It includes:

the construction, removal, reconstruction or overhead lines and underground medium voltage (22-20-15-6,5 KV) and low voltage, including the connections between elements of these lines

settlement and associated ancillary works on high voltage underground cables, (66-150 KV)

The construction, removal of overhead distribution substations, distribution substations equipment indoor M.V. underground facilities including their connections to the network, modification or improvement Overhead low voltage overhead and underground telecommunication lines

Work in substations 22/6,6 KV etc

Maintenance overhead M.V. installations and L.V.

Positioning and connection of single phase and three phase meters, single and double invoice

Arrangements and other ancillary works (for instance, construction of crossings spare tubes) for underground cables above the trend

Repair or replacement of parts on existing lines as above, or on elements such lines including connections became necessary

Perform work under stress in medium voltage